It took me a fair while, but I've finished migrating my VPS off Linode now - finally. I was spending ~£20/month on servers, and that's set to increase by another 20% this month. I've now gone for [Contabo](https://contabo.com), who are pretty reputable and were offering a really good package - 4-CPU, 8GB RAM, 400GB SSD VPS for roughly £9 a month, once VAT is factored in. So now I've got more resources, for less than half the price.
|
|
|
|
Migration took longer than I thought it would - as these things tend to - but that's mostly because I used it as an opportunity to also fix a few bits of tech debt I'd built up through hamfisted attempts at tacking features on. Naturally, this meant doing a lot of things by hand (and this time remembering to write down what I did for next time).
|
|
|
|
Now my frontend & CMS are on separate domains, rather than co-located in the same directory. It makes for a cleaner split, and will make it easier for me to move away from Wordpress at some point.
|
|
|
|
Next up is to also move my Mastodon instance onto this server, and then decommission that one, after which I won't need to have anything on Linode at all, and can safely delete that account.
|